Turnkey drying project

Turnkey Drying Project Process | From First Enquiry to First Packed Bag

The fear behind every first drying project in a new market is not the price – it is being abandoned after the containers land. This page shows the whole turnkey process as a checklist: what happens at each stage, what you provide, what we provide, and how long each step takes, from the drying test to the day your operators run the line without us.

1-3 week drying test15-30 day installation2-5 day commissioningOperator training includedOne spares catalogue
Multi-layer belt drying machine installed in factory
Quick Answer

A turnkey project runs in seven stages: enquiry, drying test, layout and quotation, contract and manufacturing, shipping, installation and commissioning, then training and handover. Typical installation takes 15-30 days on site, commissioning 2-5 days per line.

The drying test is the anchor: send 3-5 kg of your material and we run it on the quoted machine type, returning drying curves, colour photos and moisture readings. The quotation, the layout and the recipe are all built on those results – not on assumptions.

Contract to shipment is typically 12-16 weeks for a full line. Equipment is typically only 35-55% of a landed project; the process on this page exists to control the rest – freight, customs, civil works, installation and training – with one accountable supplier.

15-30 daystypical on-site installation
3-5 kgsample for the drying test
12-16 weekscontract to shipment, typical
2-5 dayscommissioning per line
1 cataloguespares for every machine in the line
The Seven Stages

What Happens, Who Does What, How Long It Takes

1. Enquiry and material data

You send the material, its moisture, the target product and grade, and your daily or hourly input. We answer with the machine type, the drying approach and the questions that decide sizing – heat source, building, market grade.

2. Drying test on your own material

You send 3-5 kg. We wash, pre-treat and dry it on the quoted machine type and return the drying curve, colour photos, moisture readings and yield. For blended lines each material is tested separately and in the planned mix.

3. Layout drawing and quotation

The test results become a line layout on your floor plan: equipment positions, power drops, drain runs, container plan, and a landed budget split into equipment, freight, civil works and installation – typically 35-55% equipment, the rest made visible.

4. Contract and manufacturing

Production runs 8-14 weeks for a full line. You receive photo and video progress at agreed milestones, and the finished machines are factory-tested – assembled, run and measured – before packing.

5. Shipping and arrival

Machines ship knock-down in 40HQ containers, 1-2 for a room plant up to 6-12 for a full line. We provide the packing list, commercial invoice and installation manual set for customs; a container plan is agreed with the layout so site access is ready.

6. Installation and commissioning

Our engineers or a supervised local crew install in 15-30 days, then commission with your material: 2-5 days of recipe tuning until the line holds the tested moisture, colour and capacity. Remote video support covers the gaps between visits.

7. Training and handover

Operators are trained on running, cleaning and changeovers; your maintenance staff get the wear-parts list and one spares catalogue covering every machine in the line. The handover pack includes the recipes, curves and acceptance records from commissioning.

Timeline

The Project On One Page

Stage Typical duration You provide We provide Data basis
Enquiry 1-3 days Material data, target grade Machine type and approach –
Drying test 1-3 weeks 3-5 kg sample Curves, photos, moisture, yield –
Layout and quotation 1-2 weeks after test Floor plan, power data Layout drawing, landed budget –
Manufacturing 8-14 weeks Milestone sign-offs Built and factory-tested machines B – typical
Shipping 3-6 weeks by route Customs clearance (or our agent) Container plan, full docs set B – typical
Installation 15-30 days Foundation, power, water ready Engineers, tools, supervision B – typical
Commissioning and training 2-5 days Operators and material Tuned recipes, training, handover pack –

Durations are typical ranges for export projects; remote-support-only projects (crew supplied locally) shorten the on-site stages. Custom builds can extend manufacturing.

Solution

Who Actually Builds Your Plant

Food processing machinery factory - washing, cutting and drying equipment built in house
Washers, dryers, mills and packers built under one roof
Hot air circulation tray oven units with protective film in final assembly at our workshop
Oven units in final assembly before factory testing
Continuous mesh belt drying machine assembled in the workshop
Belt dryer assembled and run in the workshop before dispatch
Quick Quote

Tell Us Your Material And Capacity – We Size The Line

  • Material, variety and initial moisture
  • Fresh input per day or per hour
  • Target final moisture and finished grade
  • Available heat source and factory dimensions

Prefer email? Write to info@tondemachine.com or WhatsApp +86 185 0387 4173. Our engineers reply within one working day.

    Scope

    Turnkey Means One Throat To Choke

    When the washer, the dryer and the packer come from three suppliers, a stalled project produces three blame chains – and the installation schedule is the first casualty. A turnkey contract makes one supplier accountable for the whole chain, from the drying test to the first packed bag.

    We build every machine in the chain in our own factory, so commissioning is tuning one system, not negotiating between vendors – and the spares list is one catalogue, not a dozen manuals in different languages.

    The deepest value is in the test: the line you receive was already run on your material before it was quoted. There is no gap between what was sold and what was proven.

    Line Photos

    Delivery and Installation

    Multi-layer belt drying machine installed in factory
    Belt dryer installed and aligned in the customer building
    Air-source heat pump food drying room with PLC control installed outdoors at a fruit farm
    Heat pump rooms installed outside and ducted into the plant
    Double-chamber hot air circulation tray oven installed in a customer workshop, trolleys inside
    Batch ovens commissioned inside a customer workshop
    Get a Layout

    Send Your Material Data – Get a Line Layout & Price

    • Daily or hourly fresh input and target final moisture
    • Available heat source: electric, steam, gas, biomass or diesel
    • Factory length, width and clear height
    • Target market grade and packing format

    Prefer email? Write to info@tondemachine.com or WhatsApp +86 185 0387 4173. Our engineers reply within one working day.

      Deliverables

      What A Turnkey Contract Includes

      Deliverable Stage Format
      Drying test report Test Curves, photos, moisture, yield per material
      Line layout drawing Quotation Plan view on your floor plan, to scale
      Utility specification Quotation Power, heat, water, drainage, compressed air
      Factory test records Manufacturing Run photos and measured performance
      Container plan and docs Shipping Packing list, invoice, manuals, customs set
      Commissioning acceptance Installation Signed test results on your material
      Training and spares pack Handover Operator training, wear-parts list, catalogue
      Data Basis

      How To Read The Numbers On This Page

      About the numbers on this page. Capacity, temperature and moisture figures are industry-typical values for this material. Energy consumption, utility requirements, floor space and payback are engineering estimates and are marked typical, to be confirmed by test. We confirm every figure against a drying test with your own material before quotation. Price ranges are indicative ex-works figures and exclude freight, customs clearance, civil works, utilities, installation and commissioning – equipment typically accounts for 35–55% of a landed project budget.

      FAQ

      Frequently Asked Questions

      Do you send engineers to my country for installation?

      Yes – that is the standard turnkey scope. Engineers install, commission and train on site in 15-30 days plus 2-5 days of commissioning. Where visas or budgets block travel, we run supervised installation with a local crew over live video and detailed stage manuals.

      Who handles customs clearance?

      We provide the full document set – packing list, commercial invoice, certificates and the container plan. Clearance runs through your broker or ours; for first-time importers our agent handling door-to-door is usually the safer route.

      How do I know the machine will dry MY material?

      Because it already has. The drying test on your sample drives the quotation, the layout and the recipe, and commissioning is accepted against the same test results. No line is quoted on assumptions.

      What if my material changes after the line is built?

      The chain is sized with margin and the recipes are stored per material. Most lines absorb a new crop with a test sample and a recipe update – and we support that remotely.

      What happens when a part wears out in year three?

      You order from one spares catalogue that covers every machine in the line, shipped by courier or with the next container. Wear parts are listed in the handover pack with recommended stock quantities.

      What warranty comes with a turnkey line?

      Typically 12-24 months on the machines, with remote diagnostics first and parts dispatched from our catalogue. The exact terms are fixed in the contract before manufacturing starts.

      Request a Quotation

      Request Your Turnkey Quotation

      • Factory-direct price, no middleman
      • Process design, layout drawing and utility specification
      • Drying test with your own material before quotation
      • Worldwide shipping, installation and remote commissioning support

      Prefer email? Write to info@tondemachine.com or WhatsApp +86 185 0387 4173. Our engineers reply within one working day.