Date drying line

Date, Fig and Jujube Drying Line | High-Sugar Fruit Dried Clean, Without Sugaring Out

Dates, figs and jujubes carry 55-70% sugar, and that sugar decides the drying recipe: dry them fast or hot and the skin hardens, sugar weeps to the surface and the batch turns sticky and dark. This line runs a brush wash, a wax-cracking dip, then staged 50-65°C heat pump drying to 18-24% moisture, followed by conditioning, grading and packing. Sized from 1 t/day for a cooperative to 10 t/day for an export packer.

1-10 t/day fresh fruitTo 18-24% soft-chew moisture50-65°C staged heat pumpFrom USD 18,000 ex-worksSugar migration controlled
Brush cleaning machine for dates and jujubes before drying
Quick Answer

A date drying line takes whole fruit through brush washing, wax-layer cracking, staged 50-65°C heat pump drying, conditioning and grading. Whole dates, figs and jujubes finish at 18-24% moisture for the soft-chew grade in 24-48 hours.

The critical control is sugar migration: sugar moves from the flesh to the surface when the skin stays intact and the temperature spikes early. Cracking the wax layer and holding a staged temperature curve keeps the sugar inside the fruit and the surface dry.

Indicative equipment budget: USD 18,000-45,000 for a 1-2 t/day room line, USD 45,000-90,000 for 3-5 t/day, USD 90,000-180,000 for 8-10 t/day with grading and packing. Equipment is typically only 35-55% of a landed project; freight, customs, civil works, installation and commissioning make up the rest.

75-60% → 18-24%moisture, soft-chew grade
50-65°Cstaged heat pump range
24-48 hwhole-fruit drying cycle
3-4 : 1fresh to dried ratio
USD 18k-180kindicative equipment budget
Process Flow

From Fresh Fruit to Graded Packs, Stage By Stage

1. Intake and brush washing

Fruit is tipped into a receiving hopper and passed through a brush washing machine – for dates typically a brush washer with an ozone or spray rinse. The brushes strip dust and field residue from the wrinkled skin, which a spray bar alone cannot reach.

2. Wax-layer cracking

Dates and jujubes carry a thin wax layer that locks moisture in. A 30-60 second dip in 80-90°C water, or scoring by brush, micro-cracks the skin so moisture leaves evenly. Skip this step and drying time stretches while the skin case-hardens.

3. Staged heat pump drying – the core stage

Fruit is tray-loaded onto trolleys and dried in heat pump rooms on a staged curve: 50-55°C while free water leaves, rising to 60-65°C mid-cycle, then backing to 50-55°C to finish. Humidity is discharged, not recirculated, so the chamber stays below the point where surface sugar turns sticky.

4. Conditioning

Fruit leaves the room at uneven moisture between skin and flesh. Resting 12-24 hours in ventilated bins lets it equalise to a uniform 18-24%, so packs hold the soft-chew texture buyers grade by instead of sweating in the bag.

5. Grading and packing

Fruit is size-graded – by roller grader or manual inspection – then packed: 5-10 kg barrier cartons for bulk buyers, or retail bags from a packing machine. Metal detection sits before packing for export lots.

Equipment

What The Line Contains – Wet End, Rooms and Downstream

# Equipment Qty Power What it does
1 Receiving hopper and dates brush washing machine 1 3-5.5 kW Strips dust and residue from wrinkled skins before drying
2 Hot-water dip tank or steam conditioner 1 set 18-36 kW 30-60 s at 80-90°C cracks the wax layer for even moisture loss
3 Heat pump drying rooms, 2-8 chambers 1 set 30-90 kW Staged 50-65°C drying with humidity discharge
4 Trolleys and food-grade trays per room – Single or double layer loading, 8-12 kg fruit per m²
5 Conditioning bins, ventilated 2-4 – 12-24 h moisture equalising
6 Size grader (roller or manual table) 1 1.5 kW Jumbo, large, medium grades
7 Metal detector and packing machine 1 set 4.5-7.5 kW Final safety check, barrier bags or retail packs

Configuration shown for a 3-5 t/day fresh-fruit line. Typical arrangement – final equipment list and motor ratings are confirmed after a drying test with your fruit.

Solution

High-Sugar Fruit Handling, Built By Us

Brush cleaning machine for dates and jujubes before drying
Brush washing machine cleaning dates without splitting the skin
Continuous belt blanching machine for colour setting before drying
Continuous blancher used for the 80-90°C wax-cracking dip
Packing machine with bag former for dried fruit and vegetable products
Packing machine sealing date and jujube packs in barrier film
Quick Quote

Tell Us Your Material And Capacity – We Size The Line

  • Material, variety and initial moisture
  • Fresh input per day or per hour
  • Target final moisture and finished grade
  • Available heat source and factory dimensions

Prefer email? Write to info@tondemachine.com or WhatsApp +86 185 0387 4173. Our engineers reply within one working day.

    Scope

    Why High-Sugar Fruit Needs One Supplier, Not Three

    Every mistake in a date line compounds: a washer that splits skins feeds a dip tank that over-softens them, and fruit that enters the rooms wet sticks to trays within the first hour. When one engineering team supplies the washer, the dip, the rooms and the packer, the whole curve is tuned on the same fruit.

    We build the brush washers, blanchers, drying rooms and packing machines in our own factory and quote them as one system sized to the same daily tonnage – one layout, one commissioning team, one spares catalogue.

    That is what makes the sugar-migration control real: the dip temperature, the room recipe and the loading density were tested together, not assumed from three different manuals.

    Line Photos

    Rooms and Equipment

    Stainless steel heat pump drying cabinet with 32 trays of food-grade material
    Stainless heat pump drying cabinet loaded with fruit trays
    Interior of multi-chamber stainless steel heat pump drying rooms
    Multi-chamber drying rooms – rooms run different stages in parallel
    Multi-door heat pump drying room built from 100 mm polyurethane insulation panels
    Insulated panel drying room with independent chamber doors
    Capacity

    Three Capacity Tiers

    Parameter Co-op line Mid-size plant Export plant Data basis
    Fresh fruit input 1-2 t/day 3-5 t/day 8-10 t/day B – industry
    Water removed 0.4-0.9 t/day 1.2-2.1 t/day 3.2-4.5 t/day C – estimate
    Dried output 300-600 kg/day 0.9-1.6 t/day 2.4-3.3 t/day C – estimate at 3-4:1
    Cycle time 24-48 h per batch 24-48 h 24-48 h B – industry
    Drying rooms 2-4 chambers 4-8 chambers 10+ chambers, staged loading B
    Installed power 18-35 kW 40-80 kW 110-200 kW C – estimate
    Operators per shift 3-4 5-8 10-15 B – industry
    Equipment budget USD 18k-45k USD 45k-90k USD 90k-180k B – indicative, ex-works

    Assumes whole fruit at 60-75% moisture dried to 18-24% for the soft-chew grade; a hard grade at 12-15% moisture raises the ratio to about 4-5:1. Figures marked C are typical, to be confirmed by test.

    Get a Layout

    Send Your Material Data – Get a Line Layout & Price

    • Daily or hourly fresh input and target final moisture
    • Available heat source: electric, steam, gas, biomass or diesel
    • Factory length, width and clear height
    • Target market grade and packing format

    Prefer email? Write to info@tondemachine.com or WhatsApp +86 185 0387 4173. Our engineers reply within one working day.

      Utilities

      Power, Heat and Water

      Utility Co-op line Mid-size plant Export plant Data basis
      Electricity 18-35 kW installed 40-80 kW 110-200 kW C – estimate
      Hot water (wax-cracking dip) 0.3-0.8 t/h at 85°C 1.0-2.0 t/h 2.5-4.0 t/h C – estimate
      Water (washing) 2-4 m³/day 5-10 m³/day 12-20 m³/day C – estimate
      Energy per kg water removed 0.5-0.8 kWh (heat pump) 0.5-0.8 kWh 0.5-0.8 kWh C – typical, to be confirmed by test

      Heat pump drying suits high-sugar fruit because the curve is held, not chased: staged temperatures and humidity discharge are what keep the surface dry. Industry-typical figures, to be confirmed by test.

      Layout

      Floor Space and Building Requirements

      Item Co-op line Mid-size plant Export plant
      Room line footprint 6×10 m 10×18 m 15×30 m plus packing hall
      Clear height 3.5-4 m 4-4.5 m 4.5-5 m
      Layout single row single row two rows around a trolley lane
      Floor washable, drained food-grade, drained food-grade, heavy point loads
      Container count 1 x 40HQ 2-3 x 40HQ 5-7 x 40HQ

      Wash water carries fruit sugar and needs settlement before disposal. Fruit fly and hygiene zoning matter for export packers – keep the wet end, rooms and packing hall separable.

      Data Basis

      How To Read The Numbers On This Page

      About the numbers on this page. Capacity, temperature and moisture figures are industry-typical values for this material. Energy consumption, utility requirements, floor space and payback are engineering estimates and are marked typical, to be confirmed by test. We confirm every figure against a drying test with your own material before quotation. Price ranges are indicative ex-works figures and exclude freight, customs clearance, civil works, utilities, installation and commissioning – equipment typically accounts for 35–55% of a landed project budget.

      FAQ

      Frequently Asked Questions

      Why does sugar leak out of dates during drying?

      Sugar migrates when moisture cannot leave through the skin fast enough: the wax layer holds water in, the chamber gets humid, and dissolved sugar moves to the surface and stays there. Cracking the wax layer and holding a staged temperature with humidity discharge keeps the surface dry and the sugar inside the flesh.

      Is the hot-water dip needed for every variety?

      Most wax-coated dates and jujubes benefit from a 30-60 second 80-90°C dip. Figs usually need a lighter treatment or none at all. We confirm the exact treatment on a drying test with your fruit before the layout is drawn.

      What moisture should I target?

      The soft-chew export grade finishes at 18-24% moisture; a hard, long-storage grade finishes at 12-15%. The line reaches either from the same rooms – what changes is cycle time and conditioning.

      Can dates, figs and jujubes share the same rooms?

      Yes, and most multi-crop packers do. The rooms are neutral; what changes is the recipe – loading density, dip treatment and the staged curve. Strong-aroma varieties are scheduled apart so flavours do not transfer.

      How is this better than sun drying?

      Sun drying takes 7-14 days, exposes open fruit to dust, insects and rain, and cannot hold a curve – which is exactly why surface sugaring is common in sun-dried lots. A controlled room finishes in 24-48 hours with the fruit closed inside insulated chambers.

      Will you test my fruit before I commit?

      Yes. Send 5-10 kg of each variety and we wash, dip and dry them on the quoted machine type, then return the drying curves, colour photos and moisture readings. The line is sized from those results.

      Request a Quotation

      Request Your Turnkey Quotation

      • Factory-direct price, no middleman
      • Process design, layout drawing and utility specification
      • Drying test with your own material before quotation
      • Worldwide shipping, installation and remote commissioning support

      Prefer email? Write to info@tondemachine.com or WhatsApp +86 185 0387 4173. Our engineers reply within one working day.